Operating enterprises

Coal mining enterprises of the Group of companies of Samruk-Energy JSC

Bogatyr Komir LLP

Bogatyr Komir LLP is the largest in Kazakhstan, dynamically developing company for open pit coal mining. The company accounts for 62% of coal production in the Ekibastuz coal basin and 38.1% of total coal production in Kazakhstan.

In December 2023, control tests of the cyclic-flow technology at Bogatyr open-pit mine were successfully conducted for compliance with the guaranteed project capacity of 5,500 ton/hour. The State Act of commissioning of cyclic-flow technology of Bogatyr Komir LLP was signed.

Accomplishments 2023:

  • Commissioning of the first stage of the Cyclic Flow Technology (CFT);
  • Introduction of an automated dispatch control system for overburden transportation by railway transport (ADCS railway);
  • Implementation of an automated fuel flow accounting system (FFАС POL).

General Director

Korsakov N.N.

Address

Republic of Kazakhstan, Pavlodar region, Ekibastuz city, Bauyrzhan Momyshuly str. 23

Employees

6,144

persons

Reserves and geography of the field under development

Reserves and geography of the developed field Balance coal reserves of Bogatyr Komir LLP as of January 1, 2023, are about 2.5 billion tons, including 1.2 billion tons for Bogatyropen pit mine and 1.3 billion tons for Severny open pit mine.

Official website of the company

www.bogatyr.kz

Supply chain of the enterprise

Bogatyr Komir LLP mines coal of KSH grade with average heat of combustion ~ 4,000 kcal/kg, ash content ~ 43%, moisture ~ 5%. The company supplies steam coal for generating facilities of the domestic market of the Republic of Kazakhstan and exports to the Russian Federation, as well as provides supplies of utility coal in the domestic market. Sales of coal for TPPs of the Republic of Kazakhstan are carried out under direct supply contracts, while for TPPs of the Russian Federation, they are handled through a trader. Utility coal is sold through commodity exchanges16.

Bogatyr Komir LLP owns the subsoil use right to extract coal from the Ekibastuz coal deposit within the Bogatyrand Severny surface mines in Pavlodar region of the Republic of Kazakhstan under Contract No. 975 dated June 29, 2002. Bogatyrcut, commissioned in 1970, produces coal reserves in fields 5,6,9,10. As of 01.01.2024 the depth of the cut reached 300 meters from the surface (bottom elevation minus 100 meters according to the Baltic elevation system).

Severny cut was put into operation in 1955, coal mining is carried out in fields 1,2,3,4. As of 01.01.2024, the depth of the open pit reached 260 m from the surface (bottom elevation minus 60 m according to the Baltic Height System).

Balance coal reserves of Bogatyr Komir LLP as of 01.01.2024 are about 2.45 billion/tons, including 1.2 billion/tons for Bogatyr open pit mine and 1.25 billion/tons for the Severny open pit mine.

Construction and installation works were completed in 2023. Commissioning of equipment for CFT of coal transportation from the Bogatyr open pit mine to the surface, including its averaging and continuous loading into gondola cars, has started. The switch to CFT is planned for 2023. The introduction of CFT will increase the production capacity of the Bogatyr open pit mine in terms of coal shipment up to 40.0 million/tons per year. This technology will allow:

  • Minimize the negative impact of deepening of mining operations;
  • Modernize existing production with replacement of equipment and technologies with new ones;
  • Rationalize the procedure for mining reserves within the mining allotment;
  • Reduce railcar turnaround time by 2.5 times and introduce processes for accurate loading without uncoupling trains;
  • Increase quality control and improve coal averaging.

The actual coal production of Bogatyr Komir LLP for 2023 amounted to 42.93 million tons, including by mining units:

  • Bogatyr cut — 31.43 million/tons;
  • Severny cut — 11.5 million/tons.

Initiated ‘Development of ‘Feasibility study of transition to motor-conveyor technology of overburden transportation at Bogatyr open pit’.

16 Order of the Minister of National Economy of the Republic of Kazakhstan "On approval of the list of exchange-traded goods and the minimum size of submitted lots, which are sold through commodity exchanges" No. 142 dated 26 February 2015.

Situation diagram of Ekibastuz coal basin

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 23,421 30,286 26,249
EBITDA, KZT million 34,666 37,425 32,911
EBITDA Margin, % 34 33 25
Amount of utilized investments (50%), KZT thousand 14,218,991 16,070,953 12,368,588

Production indicators

Indicator 2021 2022 2023
Volume of coal production, million/tons 44.6 42.5 42.9
Volume of coal sales in RK, million/tons 34.9 32.3 32.7
to own PP 20.0 19.5 19.4
to third-party PP 14.9 12.8 13.3
Volume of coal export, million/tons 9.8 10.1 9.8

ESG indicators

Indicator 2021 2022 2023
Pollutant emissions, thousand/tons 4.0 4.1 3.6
Average salary, KZT 301,964 391,643 505,800

Development plans at the mining facilities

In 2024 Bogatyr Komir LLP plans to produce 46,700 thousand/tons of coal (including by mining units: Bogatyr open pit — 34.7 million tons, Severny open pit — 12.0 million tons), which is 10% more than the volume of coal production in 2023 (taking into account the use of CFT).

It is planned to sell utility coal in 2024 in the amount of 500 thousand tons.

Traditional energy enterprises of the Group of companies of Samruk-Energy JSC

Almaty Power Plants JSC

Almaty Power Plants JSC is a generating enterprise producing heat and electric energy and providing supplies for all groups of consumers in Almaty and Almaty region. APP JSC is included in the Republican section of the state register of natural monopolies as a subject of natural monopoly for heat energy production for Almaty region and Almaty city.

APP JSC comprises:

  • B. Orazbayev CHPP-1, A. Zhakutov CHPP-2, CHPP-3 — generation of heat and electricity;
  • Sh. Chokin Kapshagay HPP and Cascade HPP — electricity generation;
  • Western Heat Complex (WHC) — production of heat and electricity;
  • Production and Repair Enterprise ‘Energoremont’;
  • Fuel Receiving and Unloading Center.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Chairman of the Management Board

Mashirov E.K.

Address

Republic of Kazakhstan, Almaty city, 7 Dostyk Ave.

Employees

3,011

persons

Official website of the company

www.ales.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million (11,656) 4,306 1,321
EBITDA, KZT million 16,664 16,785 18,541
EBITDA Margin, % 21 19 19
Amount of utilized investments (50%), KZT thousand 9,796,738 11,036,602 14,277,526

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 1,235.7 1,235.7 1,235.7
Electricity production volume, million/kWh 5,008 5,099 5,055
Electricity sales volume, million/kWh 4,425 4,591 4,530
Heat production volume, thousand/Gcal 5,554 5,282 5,582
Volume of heat energy sales, thousand /Gcal 5,504 5,217 5,518

ESG indicators

Indicator 2021 2022 2023
Pollutant emissions, thousand/tons 47.8 48.03 48.90
Discharges, tons 1.53 1.53 1,67
Average salary, KZT 334,454 433,391 482,932

Ekibastuz GRES-1 LLP named after Bulat Nurzhanov LLP

‘Ekibastuz GRES -1 named after Bulat Nurzhanov LLP is a condensing type thermal power plant with a design capacity of 4,000 MW, including eight power units with a capacity of 500 MW each. The station is located on the northern shore of Lake Zhengeldy, 16 km north of Ekibastuz. It is the largest thermal power plant in the country, operating on solid fuel from Ekibastuz deposits, the main energy producing enterprise in the region, and one of the largest coal-fired power plants in the world.

The project of modernization and reconstruction of equipment is being implemented at the power unit No.1, and in December 2023 a test start-up of the power unit with an average load of 100 MW was performed. During 13 hours of operation, 1.1 million kWh of electricity were generated. The unit is scheduled to be commissioned in the 2nd quarter of 2024.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

General Director

Naurzgaliev A.A.

Address

Republic of Kazakhstan, Pavlodar region, Ekibastuz city, Industrial zone of GRES -1, building 2

Employees

1,462

persons

Official website of the company

www.gres1.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 20,344 25,796 30,678
EBITDA, KZT million 61,497 72,267 71,803
EBITDA Margin, % 37 38 38
Amount of utilized investments, KZT thousand 19,864,472 42,557,298 84,862,571

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 3,500 3,500 3,500
Electricity production volume, million/kWh 22,788 23,048 22,870
Electricity sales volume, million/kWh 22,496 23,102 22,796
Heat production volume, thousand/Gcal 136 143 124
Volume of heat energy sales, thousand /Gcal 136 143 124

ESG indicators

Indicator 2021 2022 2023
Pollutant emissions, thousand/tons 241.12 242.813 238.9
Average salary, KZT 326,954 405,448 495,490

Ekibastuz GRES-2 JSC

Ekibastuz GRES-2 JSC — a thermal power plant with an installed capacity of 1,000 MW (two 500 MW power units) and the world's highest chimney, at 420 meters, which is listed in the Guinness Book of Records. The main fuel is high-ash coal from the Ekibastuz coal basin.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Ekibastuz GRES-2 JSC — a thermal power plant with an installed capacity of

1,000

MW

Chairman of the Management Board

Klets G.M.

Address

Republic of Kazakhstan, 141216, Pavlodar region, Solnechny settlement

Employees

1,372

persons

Share of ownership of Samruk-Kazyna JSC

50%

Official website of the company

www.gres2.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 4,413 4,536 - 17,322
EBITDA, KZT million 27,912 27,365 20,102
EBITDA Margin, % 42 40 30
Amount of utilized investments, KZT thousand 1,838,052 12,457,528 2,710,689

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 1,000 1,000 1,000
Electricity production volume, million/kWh 6,433 6,002 5,659
Electricity sales volume, million/kWh 6,336 5,938 5,532
Heat production volume, thousand/Gcal 76 77.5 70
Volume of heat energy sales, thousand /Gcal 243 172 206

ESG indicators

Indicator 2021 2022 2023
Pollutant emissions, thousand/tons 67.97 63.108 63.527
Average salary, KZT 276,407 361,870 428,589

RES facilities of the Group of companies of Samruk-Energy JSC

Shardara HPP JSC

The Shardara hydropower plant with installed capacity of 126 MW, with four units, is located in the middle reaches of the Syrdarya River and is the closing HPP of the Naryn-Syrdarya cascade. The main purpose of the hydrosystem is to provide irrigated farming; the water regime is set by the Committee on Water Management of MWRI. Average annual electricity generation is 537 million/kWh, electricity is consumed in Turkestan province.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Average annual electricity generation

537

million kWh

Chairman of the Management Board

Berlibayev A.A.

Address

Republic of Kazakhstan, South Kazakhstan region, Shardara city, 13, Yelmuratov str.

Employees

135

people

Official website of the company

www.sharges.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 1,124 1,939 2,624
EBITDA, KZT million 4,934 6,026 6,669
EBITDA Margin, % 69 69 74
Amount of utilized investments, KZT thousand 9,573 53,754 22,414

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 126 126 126
Electricity production volume, million/kWh 456 518 529
Electricity sales volume, million/kWh 468 540 549

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 327,012 413,506 478,067

Ust-Kamenogorsk HPP JSC

In October 2017, the concession agreement with AES Suntry Power Limited was terminated and the assets were transferred to the republican ownership of the Republic of Kazakhstan.

Legal address

Republic of Kazakhstan, Ust-Kamenogorsk city, Ablaketka settlement

Location of the executive body

Republic of Kazakhstan, Ust-Kamenogorsk city, 27, Kazakhstan str.

Main type of activity

Organizational and management activity

Bukhtarma HPP JSC

Bukhtarma HPP JSC is an economical hydroelectric power plant both in terms of the specific value of work volumes and in terms of cost indicators of electricity production. Installed capacity of the HPP is 675 MW, average annual output is 2.77 billion kWh. The station provides coverage of peak loads in the energy system of the Republic of Kazakhstan. In 2002, the Bukhtarma dam was recognized as the best in the world in terms of concrete quality. At the moment the plant is under lease.

Installed capacity of Bukhtarma HPP JSC

675

MW

Address

Republic of Kazakhstan, 070825, East Kazakhstan region, Zyryanovsky district, Serebryansk town, Graftio street, 5

Main type of activity

Lease and management of own real estate, lease of other machinery, equipment and tangible assets

Employees

8

people

Public company ‘Qazaq Green Power PLC’

Qazaq Green Power PLC was established on November 4, 2022, to assist in the modernization of existing and construction of new generating capacities, introduction of new technologies in the energy sector, to ensure increased efficiency of energy systems, implementation of investment projects of the Republic of Kazakhstan, as well as to implement energy saving policy and ensure environmental safety of energy facilities.

General Director

Zhanadil E.B.

Address

Republic of Kazakhstan, Astana city, 15-A Kabanbai Batyr str.

Employees

13

people

Financial indicators

Indicator 2023
Net income/loss, KZT million 2,245
EBITDA, KZT million 2,005
EBITDA Margin, % 85
Amount of utilized investments, KZT thousand 11,874

Moynak HPP JSC

Moynak HPP is located on the Sharyn River in Kegen district of Almaty region. The station was built under the State Program of Forced Industrial and Innovative Development and in accordance with the RK Electric Power Industry Development Program until 2030. The HPP successfully contributes to the reduction of electricity deficit in the Southern Zone of the UES of Kazakhstan (Almaty, Zhambyl, Kyzylorda and Turkestan Regions), covers peak loads and participates in capacity regulation in the energy system. Modern technological equipment ensures maximum automation and stability of the power generation process. Hydropower units of the latest modification with high technical parameters and efficiency are installed at the station.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

General Director

Aidarbekov G.A.

Address

Republic of Kazakhstan, Almaty region, Kegensky district, Zhylysaysky v/d, Moynak village, 81.

Employees

121

people

Website

www.moynak.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 9,532 9,981 10,738
EBITDA, KZT million 15,798 18,265 18,348
EBITDA Margin, % 83 80 84
Amount of utilized investments, KZT thousand 422,249 102,925 606,884

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 300 300 300
Electricity production volume, million/kWh 758 973 832
Electricity sales volume, million/kWh 781 1,014 912

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 384,432 535,611 570,153

First Wind Power Plant LLP

The First Wind Power Plant LLP is Kazakhstan's first project in the field of alternative energy sources development that has passed all stages of preparation in accordance with the current legislation on RES support. It was put into operation on August 14, 2015.

The wind farm of 22 turbines with a unit capacity of 2.05 MW is located in Akmola region, near the town of Ereimentau. Since commissioning, the wind farm has generated more than 920 million kWh of electricity at a total cost of KZT 13 billion. 100% of generated electricity is supplied to the National Power Grid of Kazakhstan — KEGOC.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

General Director

Botabekov R.K.

Address

Republic of Kazakhstan, Astana city, 15-A Kabanbai Batyr str.

Employees

37

persons

Website

www.pves.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 1,551 2,248 3,045
EBITDA, KZT million 3,973 3,974 5,014
EBITDA Margin, % 81 80 81
Amount of utilized investments, KZT thousand 196,000 157,852 475,875

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 45 45 45
Electricity production volume, million/kWh 144.59 135.72 142.60
Electricity sales volume, million/kWh 144.29 135.37 142.31

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 564,775 604,532 724,813

Ereymentau Wind Power LLP

Ereymentau Wind Power LLP implements the project ‘Construction of wind power plant in the area of Ereymentau with a capacity of 50 MW’, and in the future the production of electricity.

General Director

Khasenov B.B.

Address

Republic of Kazakhstan, Astana city, 15-A Kabanbai Batyr str.

Employees

12

persons

Website

www.ewp.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million (385) (6,487) (10,949)
EBITDA, KZT million (218) (243) (312)
Amount of utilized investments, KZT thousand 2,099,137 1,064,760 0

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 629,258 846,798 845,186

Samruk-Green Energy LLP

Samruk-Green Energy LLP — provides services on electric power generation using RES, realizes the possibility of decentralization of electric power supply to remote areas.

Implemented projects of construction of facilities:

  • Solar power plant with a capacity of 2 MW in the town of Konaev;
  • Solar power plant with a capacity of 416 kW in the town of Konaev;
  • Solar power plant with a capacity of 1 MW in ­Almaty;
  • Wind power plant with capacity of 5 MW in Yenbekshikazakh district of Almaty region.

Supply chain of the enterprise

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

General Director

Islamov D.U.

Address

Republic of Kazakhstan, Almaty city, Zenkova str. 59, office No. 145

Employees

22

persons

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 12 (2,682) 622
EBITDA, KZT million 136 62 296
EBITDA Margin, % 34 15 59
Amount of utilized investments, KZT thousand 25,592 35,463 23,866

Production indicators

Indicator 2021 2022 2023
Installed electric capacity, MW 8.4 8.4 8.4
Electricity production volume, million/kWh 20.45 19.78 21.52
Electricity sales volume, million/kWh 20.22 19.53 21.23

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 370,499 481,180 576,464

Energy of Semirechye LLP

Energy of Semirechye LLP is an enterprise established in 2009 to implement the project ‘Construction of wind power plant in Shelek corridor with capacity of 60 MW with the prospect of expansion up to 300 MW’ and further rendering services on production and sale of electric energy, design and construction of facilities using RES.

General Director

Luo Jun

Address

Republic of Kazakhstan, Almaty region, Yenbekshikazakh district, Baiseit village, 92, Abay str.

Website

www.energy7.kz

Employees

36

persons

Share of ownership

Powerchina Chengdu Engineering Corporation Limited»

15%

Share of ownership

Powerchina Resources Limited»

60%

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million (134) (591) (85)
EBITDA, KZT million (103) 872 3,824
Amount of utilized investments (25%), KZT thousand 26,130 4,946,597 56,112

Production indicators

Indicator 2021 2022
Installed electric capacity, MW 60 60
Electricity production volume, million/kWh 88.26 220.75
Electricity sales volume, million/kWh 86.40 216.33

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 413,968 787,204 1,012,040

Kazgidrotehenergo LLP

Kazgidrotehenergo LLP implements projects for design, construction and operation of facilities for the use of RES, independent technical devices and interrelated facilities for the production of electricity and/or heat using RES. Project of ‘Construction of 310 MW hybrid WPP, HPP in Almaty region.

General Director

Bukhanov M.E.

Address

Republic of Kazakhstan, Almaty city, Dostyk Ave. 188, BC ‘Kulan’, office 904

Employees

2

persons

Energy Solutions Center LLP

Energy Solutions Center LLP is a service organization for administrative support of the Group of companies of Samruk-Energy JSC, providing services on maintenance of IT infrastructure, Internet resources, real estate management (lease, acquisition, construction), special office services (personnel outsourcing), as well as transportation services.

General Director

Kataev A.M

Address

Republic of Kazakhstan, Astana city, 15A Kabanbai Batyr str.

Employees

65

persons

Official website of the company

www.e-s-center.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 35 73 102
EBITDA, KZT million 137 204 209
EBITDA Margin, % 12 13 13
Amount of utilized investments, KZT thousand 13,946 107,511 9,536

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 537,600 618,161 709,614

Private Company Altyn Dala Energy LTD

The Company was established in December 2023 to implement RES projects in the Republic of Kazakhstan.

General Director

Zharkenov B.K.

Address

Republic of Kazakhstan, Astana city, Kabanbai Batyr Avenue, building 15/1

Share of ownership

Tumar Commerce LLP

75%

Distribution companies of the Group of companies of Samruk-Energy JSC

Alatau Zharyk Company JSC

Alatau Zharyk Company JSC is the largest power grid company in the south of Kazakhstan, supplying electricity to all groups of consumers in Almaty city and Almaty region. Alatau Zharyk Company JSC represents the main part of the power grids of the Almaty energy hub with 220/110/35/6-10/0.4 kV voltage classes. The company's task is to ensure reliable and quality transmission of electricity, while reducing commercial and technical costs and improving the technical performance of substation equipment in compliance with the rules of labor safety and environmental protection.

Supply chain of the enterprise

Regional power grid companies perform the functions of electricity transmission from energy producing organizations to end consumers via power grids within their balance sheet boundaries. Alatau Zharyk Company JSC is a partner of the largest energy companies in Uzbekistan and Kyrgyzstan. Alatau Zharyk Company JSC transmission lines stretch from the shores of Lake Balkhash in the north to the borders with Kyrgyzstan in the south and from the borders of Zhambyl oblast in the west to the borders with China in the east. The UES of Kazakhstan operates in parallel with the United Energy System (UES) of Central Asia and the UES of the Russian Federation.

Chairman of the Management Board

Asylov A.N.

Address

Republic of Kazakhstan, Almaty city, 24 B Manas str.

Employees

3,737

people

Share of ownership

Alatau Zharyk Company JSC

2.6%

Official website of the company

www.azhk.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million 2,907 3,528 5,531
EBITDA, KZT million 13,136 14,394 20,789
EBITDA Margin, % 28 27 31
Amount of utilized investments, KZT thousand 12,727,043 11,645,174 16,512,888

Production indicators

Indicator Unit. 2021 2022 2023
Power transmission line-220 kV
Power transmission line-110 kV
Power transmission line-35 kV
Power transmission line-10 kV
Power transmission line-6 kV
Power transmission line-0.4 kV
km 410.34
2,673.94
2,543.06
9,363.04
140.36
10,127.52
410.34
2,673.94
2,543.06
9,363.04
140.36
10,127.52
410.34
2,648.34
2,452.58
9,488.10
136.93
9,778.56
SS-220 kV
SS-110 kV
SS-35 kV
pcs. 8
93
106
8
93
106
8
94
106
Electricity transmission million kWh 7,650 8,154 8,686
Number of consumers (commercial and other) pcs. 12 12 12

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 261,091 352,818 425,296

AlmatyEnergosbyt LLP

AlmatyEnergoSbyt LLP is one of the largest energy supplying organizations in Kazakhstan, providing electricity to more than 3.6 million residents and more than 38 thousand enterprises of Almaty city and Almaty region. The Company is a part of the energy complex of Almaty and Almaty region. The Company is part of the energy complex of Almaty city and Almaty region, which consists of energy producing, regional energy transmitting and energy supplying companies. The share of AlmatyEnergoSbyt LLP in the total supply of electricity to consumers of the country is 7%.

Supply chain of the enterprise

Purchase of electric power from power transmission organizations, and sales to end consumers on the basis of public power supply contracts. Formation of electricity tariff is carried out in accordance with the requirements of the Committee for Regulation of Natural Monopolies.

The share of AlmatyEnergoSbyt LLP in the total supply of electricity to consumers of the country

7%

General Director

Kopenov E.K.

Address

Republic of Kazakhstan, Almaty city, Kozhamkulova str. 170 A

Employees

526

persons

Website

www.esalmaty.kz

Financial indicators

Indicator 2021 2022 2023
Net income/loss, KZT million (1,742) (2,784) (3,207)
EBITDA, KZT million (3,149) (3,369) (2,499)
EBITDA Margin, % (2.5) (2.4) (1.48)
Amount of utilized investments, KZT thousand 90,019 84,922 80,238

Production indicators

Indicator 2021 2022 2023
Electricity sales volume, million kWh 6,723.8 6,847 7,085
Average tariff for electricity sales, KZT kWh 18.69 20.09 23.64
Total consumption by groups, million kWh 899,134 929,929 952,216
• Population 862,980 891,214 911,097
• Non-domestic consumers, including: 36,154 38,715 41,119
- Industrial and equated consumers 1,936 1,912 1,937
- Budget organizations 1,319 1,337 1,312
- Other consumers 32,899 35,466 37,870

ESG indicators

Indicator 2021 2022 2023
Average salary, KZT 286,464 396,047 445,453